Architecture and design
From concept to executive project, with technique and aesthetics integrated.
FILE 00 · 2006-2026 · PANAMA
REV · 09/09/2026We integrate architecture, site execution and electrical engineering in a single team. With over two decades of practice, the value lies in the cohesion between design, building technique and the client’s vision.
PROJECT
Wilcox & Associates
LOCATION
Obarrio · Panamá
CONTACT
info@wilcox.la
REVISION
09/09/2026
SCALE
1:1
LINES
06
FIRM · SINCE
2007
NORTH
N ↑
Every line we draw seeks balance between the aesthetic, the human and the functional.
From concept to executive project, with technique and aesthetics integrated.
General contractor and special systems, from structural shell to close-out.
Standards, permits and quality control under project management.
Feasibility, ROI and structuring for investors.
Processes, layouts and operational efficiency on the plant floor.
BIM modeling, MEP coordination and digital deliverables by phase.
TECHNICAL DIRECTION
President and technical director · Wilcox & Associates / Pro Eléctrica, S.A. · since 2007
The technical side (architecture, engineering and JTIA professional licenses) is led by architect Walter Wilcox and his team; the commercial area manages clients, tenders and agreements.
TRACK RECORD
Antonio Docabo y Asoc. Drawing development and site inspection.
Humberto Echeverría y Asoc.
Ingeniería Carpenn.
Luxes Iluminación. Coordination, supervision and lighting design.
Independent practice.
Pro Eléctrica / M&W Arquitectos. President.
Wilcox & Associates / Pro Eléctrica, S.A. President.
Twenty years of public and private work in Panama, measured the way a drawing is measured: by milestones.
Independent practice of architect Walter F. Wilcox.
Wilcox & Associates / Pro Eléctrica, S.A. is incorporated. ABB service station (civil works) and Influent Call Center, in Colón.
Renovation of Hotel Next, US$ 1.5M in civil works; in 2011, the design of The Village, Coronado.
Ernesto T. Lefevre school: coordination since 2018 and electrical and special-systems contract in 2021; ABW industrial warehouse.
Brutto restaurant, Costa del Este, in coordination; behind it, Copa HUB T2 (2024), PALIG (2023), IDAAN Chilibre (2022) and the 2023-2025 McDonald's program.
| YEAR | WORK |
|---|---|
| 2026 | Restaurante Brutto, Costa del EsteCoordination and development |
| 2025 | McDonald's City Mall FronteraRenovation |
| 2025 | Food Hall SantamaríaCoordination and development |
| 2024 | Restaurante Luccas, Terminal 1Coordination and development · AITSA |
| 2024 | Restaurante Luccas, Brisas del GolfCoordination and development |
| 2024 | McDonald's City MallRenovation |
| 2024 | McDonald's San MateoRenovation |
| 2023 | McDonald's ChitréRenovation |
| 2023 | McDonald's PanamericanaRenovation |
| 2023 | McDonald's SantiagoRenovation |
| 2022 | PH The MilleniumReport |
| 2022 | Edificio administrativo, Planta Potabilizadora Federico Guardia Conte, ChilibreDesign and development · IDAAN |
| 2022 | Dormitorios INA/MIDAReport |
| 2022 | PH La ReservaElectrical design coordination |
| 2022 | Cuartos fríos, Etapa IIDesign and development · Frigoservice |
| 2021 | Oficinas IDAAN ColónCoordination and development · IDAAN |
| 2021 | Galera Industrial ABWDesign and development |
| 2019 | Esc. Altos de San FranciscoCoordination and development |
| 2018 | Esc. Ernesto T. LefevreCoordination and development |
| 2016 | Palco y vestidoresInspection · Fepafut |
| 2016 | Farmacias Metro MarbellaElectrical design coordination · Farmacias Metro |
| 2016 | Farmacias Metro San FranciscoElectrical design coordination · Farmacias Metro |
| 2015 | Farmacias Metro Vía ArgentinaElectrical design coordination · Farmacias Metro |
| 2015 | Oficinas OF904, PH Office Plex 71Design and development |
| 2014 | Oficinas Banco Lafise, Torre Global, piso 21Design and development · Lafise |
| 2014 | Banco Lafise, Condado Business CenterDesign and development · Lafise |
| 2012 | Oficinas Ben Betesh, PH OceaniaDesign and development · Ben Betesh |
| 2012 | Supermercado Rey Costa VerdeElectrical design coordination · Rey |
| 2012 | Supermercado Rey 2412Electrical design coordination · Rey |
| 2011 | Centro Comercial The Village, CoronadoDesign and development |
| 2011 | Tienda FarmaXpressInspection |
| 2009 | Edificio de cuartos fríosDesign and development · Arcata Company Inc. |
| 2008 | Tocumen Office ParkSchematic design |
| 2007 | Escuela Alianza Bíblica: oficinas, educación y dormitoriosDesign and development |
| 2006 | Centro Comercial MulticentroElectrical design coordination |
| 2006 | Interplaza, Zona LibreCoordination and development |
| 2006 | Midrasha Levanot Jorev, parvularioCoordination and development |
| 2005 | Business Park, Costa del EsteLighting design |
| YEAR | WORK | AMOUNT |
|---|---|---|
| 2024 | Oficinas Servicio a Bordo, Operaciones de Vuelo y HUB Control Center, Terminal 2, TocumenElectrical and special-systems contract | 170 000 |
| 2023 | Oficinas PALIG, Costa del EsteElectrical and special-systems contract | 305 000 |
| 2022 | Tres tiendas DFA, Terminal 2, TocumenElectrical and special-systems contract | 75 000 |
| 2021 | Esc. Ernesto T. LefevreElectrical and special-systems contract | 325 000 |
| 2014 | Centro Comercial Plaza del LagoElectrical and special-systems contract | 700 000 |
| 2012 | Oficinas Ben Betesh, Torre OceaniaElectrical and special-systems contract · Ben Betesh | 210 000 |
| 2011 | Tienda FarmaXpressElectrical and special-systems contract | 140 000 |
| 2011 | Residencia Abrego, Las CumbresCivil works | 75 000 |
| 2010 | Remodelación del Hotel NextCivil works | 1 500 000 |
| 2007 | Estación de Servicio ABBCivil works | 165 000 |
| 2007 | Influent Call Center, ColónElectrical and special-systems contract | 85 000 |
| 2006 | Casino La DoñaElectrical and special-systems contract | 120 000 |
| 2006 | Edificio La Ribera, Costa del EsteElectrical and special-systems contract | 60 000 |
| 2006 | Casino Fiesta, Hotel El PanamáElectrical and special-systems contract | 65 000 |
| 2005 | Business Park, Costa del EsteLighting works | 80 000 |
| Total | US$ 4 075 000 |
| YEAR | WORK |
|---|---|
| 2007 | Edificio ParamountElectrical design coordination |
| 2007 | Edificio VitroElectrical design coordination |
| 2007 | Edificio CitrusElectrical design coordination |
| 2007 | Edificio LorkaElectrical design coordination |
| 2006 | Edificio Ten Tower, Costa del EsteElectrical design coordination |
| 2006 | Edificio Costa del Este PijaoElectrical design coordination |
| 2006 | Edificio Altamar del EsteElectrical design coordination |
| 2006 | Edificio Clayton ParkElectrical design coordination |
| 2004 | Edificio La Ribera, Costa del EsteLighting design |
| YEAR | WORK |
|---|---|
| 2015 | Urbanización Condado del Pacífico, ChitréSchematic design |
| 2008 | Conjunto Turístico Estancia Santa Rosa Rancho & Country ClubMaster plan |
| 2008 | Riverside Village of ChameDesign and development |
| 2007 | Vista BahíaCoordination and development |
| YEAR | WORK |
|---|---|
| 2006 | Penthouse, Edificio BellagioDesign |
| 2004 | Residencia Gabriel Diez, Costa del EsteLighting design |
Professional register of the technical director.
REFERENCES · 16 CLIENTS
Let us talk about your project.
Contact the studio